MPC-MPC04400
205.9 MW generation in Grand Forks, ND · In queue since February 2022 · Proposed COD December 2024
205.9 MW
Capacity
1
Components
Wind
4y 3m
In Queue
System Impact Study
IA Status
COD target: 2024
Total Duration
2y 10m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-23
MPC-MPC04400 is a proposed wind generation project with a total capacity of 205.9 MW. The project is located in Grand Forks County, North Dakota, and is being developed by Minnkota Power Cooperative (MPC). It is currently active in the Midcontinent Independent System Operator (MISO) interconnection queue, with a queue entry date of February 4, 2022. The proposed commercial operation date is December 23, 2024. The project's interconnection status is currently in the System Impact Study phase, and the point of interconnection (POI) is the Center-Prairie 345 kV Line.
Generated from interconnection queue and public data sources
State
ND
County
Grand Forks
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
Minnkota Power Cooperative
Entity
MPC
Service Type
—
Point of Interconnection
Center-Prairie 345 kV Line
Data Source
LBNL
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MPC-MPC04400