N-C-NC5-005
200 MW hybrid in Clark, NV · In queue since May 2018 · Proposed COD September 2021
200 MW
Capacity
1
Components
Solar
8 years
In Queue
—
IA Status
COD target: 2021
Total Duration
3y 4m
Schedule
57 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-09-01
The proposed N-C-NC5-005 project is a 200 MW solar and battery hybrid development in Clark County, Nevada. Interconnecting to the Navajo-Crystal utility, the project is located in the West region and consists of 200 MW of solar capacity.
The project is currently active in the Navajo-Crystal interconnection queue as entry N-C-NC5-005, with a queue entry date of May 2, 2018. The proposed commercial operation date is September 1, 2021, and the point of interconnection is the South Crystal 525 kV Switchyard.
Generated from interconnection queue and public data sources
State
NV
County
Clark
Grid Region
Mountain West
Market
—
Developer
—
Utility
Navajo-Crystal
Entity
N-C
Service Type
—
Point of Interconnection
South Crystal 525 kV Switchyard
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.