Little Pond Solar
20 MW generation in Orange, NY · In queue since September 2016 · Proposed COD January 2025
20 MW
Capacity
1
Components
Solar
9y 8m
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
8y 4m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-01-01
Little Pond Solar is a proposed 20 MW solar generation project located in Orange County, New York. The project, developed by Little Pond Solar, LLC, is interconnected to the NYISO grid under queue ID NYISO-575. The project entered the NYISO interconnection queue on September 16, 2016, and has a proposed commercial operation date of January 1, 2025. Its interconnection status is currently in the Facility Study phase.
The proposed point of interconnection is the Mongaup - Shoemaker 69kV line. The project is actively listed in the NYISO interconnection queue. The local utility is O&R.
Generated from interconnection queue and public data sources
State
NY
County
Orange
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Little Pond Solar, LLC
Utility
O&R
Entity
NYISO
Service Type
—
Point of Interconnection
Mongaup - Shoemaker 69kV
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- ZONE G
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Little Pond Solar