North Side Solar (NYISO-620) — Project Summary

Queue ID
NYISO-620
Capacity
180 MW
Technology
Solar
Status
active
Location
St. Lawrence, NY
Region
NYISO
Developer
North Side Energy Center, LLC
IA Status
Facility Study

North Side Solar

NYISO-620BetaActiveSolarNYISOLBNL

180 MW generation in St. Lawrence, NY · In queue since March 2017 · Proposed COD April 2028

180 MW

Capacity

1

Components

Solar

9y 2m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

11y 1m

Facilities Study50%
Queue EntryMar 27, 2017

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-01

About

North Side Solar is a proposed 180 MW solar generation project located in St. Lawrence County, New York. The project, developed by North Side Energy Center, LLC, is interconnected to the NYISO grid at the Massena - Moses 230kV point of interconnection. It entered the NYISO interconnection queue as queue ID NYISO-620 on March 27, 2017, and has a proposed commercial operation date of April 1, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project is designed as a 180 MW solar facility. The interconnecting utility is NYPA. The project is currently listed as active within the NYISO interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

St. Lawrence

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

North Side Energy Center, LLC

Utility

NYPA

Entity

NYISO

Service Type

Point of Interconnection

Massena - Moses 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE D
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about North Side Solar