North Side Solar
180 MW generation in St. Lawrence, NY · In queue since March 2017 · Proposed COD April 2028
180 MW
Capacity
1
Components
Solar
9y 2m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
11y 1m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-01
North Side Solar is a proposed 180 MW solar generation project located in St. Lawrence County, New York. The project, developed by North Side Energy Center, LLC, is interconnected to the NYISO grid at the Massena - Moses 230kV point of interconnection. It entered the NYISO interconnection queue as queue ID NYISO-620 on March 27, 2017, and has a proposed commercial operation date of April 1, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project is designed as a 180 MW solar facility. The interconnecting utility is NYPA. The project is currently listed as active within the NYISO interconnection queue.
Generated from interconnection queue and public data sources
State
NY
County
St. Lawrence
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
North Side Energy Center, LLC
Utility
NYPA
Entity
NYISO
Service Type
—
Point of Interconnection
Massena - Moses 230kV
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- ZONE D
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.