Trelina Solar Energy Center
79.8 MW generation in Seneca, NY · In queue since June 2018 · Proposed COD January 2025
79.8 MW
Capacity
1
Components
Solar
7y 11m
In Queue
System Impact Study
IA Status
COD target: 2025
Total Duration
6y 7m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-01-01
The Trelina Solar Energy Center is a proposed 79.8 MW solar generation project located in Seneca County, New York. Developed by Trelina Solar Energy Center, LLC, the project is interconnected to the New York State Electric and Gas (NYSEG) utility. It is currently active in the New York Independent System Operator (NYISO) interconnection queue as project number NYISO-720, with an original queue entry date of June 7, 2018.
The proposed commercial operation date for the Trelina Solar Energy Center is January 1, 2025. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection (POI) is the Border City - Station 168 115 KV. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
NY
County
Seneca
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Trelina Solar Energy Center, LLC
Utility
NYSEG
Entity
NYISO
Service Type
—
Point of Interconnection
Border City - Station 168 115 KV
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- ZONE B
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- STA_168_34_KV_BK1_2_REV_LBMP_B
- POI Substation
- Station 168
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Trelina Solar Energy Center