South Ripley Solar and BESS (NYISO-783) — Project Summary

Queue ID
NYISO-783
Capacity
270 MW
Technology
Solar+Battery
Status
active
Location
Chautauqua, NY
Region
NYISO
Developer
ConnectGen Chautauqua County LLC
IA Status
Facility Study

South Ripley Solar and BESS

NYISO-783BetaActiveSolarBatteryNYISOLBNL

270 MW hybrid in Chautauqua, NY · In queue since December 2018 · Proposed COD January 2027

270 MW

Capacity

1

Components

Solar

7y 5m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

8y 1m

Facilities Study50%
Queue EntryDec 7, 2018

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-01-01

About

The South Ripley Solar and BESS project is a proposed 270 MW hybrid solar and battery energy storage system development in Chautauqua County, New York. The project, being developed by ConnectGen Chautauqua County LLC, consists of 270 MW of solar generation. It is interconnected to the New York Independent System Operator (NYISO) queue as project number NYISO-783, with an original queue entry date of December 7, 2018.

The proposed commercial operation date for the South Ripley Solar and BESS project is January 1, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the South Ripley Substation at 230kV. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Chautauqua

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

ConnectGen Chautauqua County LLC

Utility

NM-NG

Entity

NYISO

Service Type

Point of Interconnection

South Ripley Substation 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE A
Hub Confidence
HIGH
Nearest Node (Estimated)
NEPA___ENERGY
POI Substation
South Ripley Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about South Ripley Solar and BESS