Rich Road Solar Energy Center (NYISO-800) — Project Summary

Queue ID
NYISO-800
Capacity
240 MW
Technology
Solar+Battery
Status
active
Location
St. Lawrence, NY
Region
NYISO
Developer
EDF Renewables Development, Inc.
IA Status
System Impact Study

Rich Road Solar Energy Center

NYISO-800BetaActiveSolarBatteryNYISOLBNL

240 MW hybrid in St. Lawrence, NY · In queue since February 2019 · Proposed COD April 2028

240 MW

Capacity

1

Components

Solar

7y 3m

In Queue

System Impact Study

IA Status

COD target: 2028

Interconnection

Total Duration

9y 2m

Impact Study25%
Queue EntryFeb 20, 2019

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-01

About

The Rich Road Solar Energy Center is a proposed 240 MW hybrid solar and battery project located in St. Lawrence County, New York. Developed by EDF Renewables Development, Inc., the project consists of 240 MW of solar capacity. It is interconnected to the NYISO queue as entry NYISO-800, with a queue entry date of February 20, 2019. The proposed commercial operation date is April 1, 2028. As of the latest data, the project's interconnection status is in the System Impact Study phase.

The Rich Road Solar Energy Center is slated to connect to the Moses - Adirondack 230 kV Line #2 (MA2) and has appeared in recent news coverage pertaining to regulatory and industry matters.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

St. Lawrence

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

EDF Renewables Development, Inc.

Utility

NYPA

Entity

NYISO

Service Type

Point of Interconnection

Moses - Adirondack 230 kV Line #2 (MA2)

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE D
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.