Rich Road Solar Energy Center
240 MW hybrid in St. Lawrence, NY · In queue since February 2019 · Proposed COD April 2028
240 MW
Capacity
1
Components
Solar
7y 3m
In Queue
System Impact Study
IA Status
COD target: 2028
Total Duration
9y 2m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-01
The Rich Road Solar Energy Center is a proposed 240 MW hybrid solar and battery project located in St. Lawrence County, New York. Developed by EDF Renewables Development, Inc., the project consists of 240 MW of solar capacity. It is interconnected to the NYISO queue as entry NYISO-800, with a queue entry date of February 20, 2019. The proposed commercial operation date is April 1, 2028. As of the latest data, the project's interconnection status is in the System Impact Study phase.
The Rich Road Solar Energy Center is slated to connect to the Moses - Adirondack 230 kV Line #2 (MA2) and has appeared in recent news coverage pertaining to regulatory and industry matters.
Generated from interconnection queue and public data sources
State
NY
County
St. Lawrence
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
EDF Renewables Development, Inc.
Utility
NYPA
Entity
NYISO
Service Type
—
Point of Interconnection
Moses - Adirondack 230 kV Line #2 (MA2)
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- ZONE D
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.