Hilltop Solar
20 MW generation in Rensselaer, NY · In queue since March 2019 · Proposed COD May 2028
20 MW
Capacity
1
Components
Solar
7y 2m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
9y 2m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-01
Hilltop Solar is a proposed 20 MW solar generation project located in Rensselaer County, New York. The project, developed by SunEast Hilltop Solar LLC, is interconnected within the New York Independent System Operator (NYISO) queue as project number NYISO-807, with an interconnection queue entry date of March 28, 2019. The proposed commercial operation date is May 1, 2028. Its interconnection status is currently in the Facility Study phase.
The project is linked to the existing SunEast Hilltop Solar Project operating plant (EIA ID 63868). Recent news coverage has discussed the development.
Generated from interconnection queue and public data sources
State
NY
County
Rensselaer
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
SunEast Hilltop Solar LLC
Utility
NM-NG
Entity
NYISO
Service Type
—
Point of Interconnection
Eastover - Schaghticoke 115kV
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- ZONE F
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Hilltop Solar