Dolan Solar
20 MW generation in Washington, NY · In queue since May 2019 · Proposed COD December 2026
20 MW
Capacity
1
Components
Solar
7 years
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
7y 7m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-01
The proposed Dolan Solar project is a 20 MW solar generation facility located in Washington County, New York. Developed by Dolan Solar, LLC, the project consists of 20 MW of solar photovoltaic generation. It is currently in the New York Independent System Operator (NYISO) interconnection queue as project number NYISO-833, with an initial queue entry date of May 6, 2019.
The project's proposed commercial operation date is December 1, 2026. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the Battenkill - Mohican 115kV line. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
NY
County
Washington
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Dolan Solar, LLC
Utility
NM-NG
Entity
NYISO
Service Type
—
Point of Interconnection
Battenkill - Mohican 115kV
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- ZONE F
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Dolan Solar