Highbanks Solar (NYISO-863) — Project Summary

Queue ID
NYISO-863
Capacity
20 MW
Technology
Solar
Status
active
Location
Livingston, NY
Region
NYISO
Developer
Highbanks Solar LLC
IA Status
Facility Study

Highbanks Solar

NYISO-863BetaActiveSolarNYISOLBNL

20 MW generation in Livingston, NY · In queue since May 2019 · Proposed COD February 2026

20 MW

Capacity

1

Components

Solar

7 years

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

6y 9m

Schedule

3 months past proposed COD

Facilities Study50%
Queue EntryMay 29, 2019

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-02-01

About

Highbanks Solar is a proposed 20 MW solar generation project located in Livingston County, New York. The project, developed by Highbanks Solar LLC, is interconnected to the RG&E utility network and is listed in the NYISO interconnection queue as queue ID NYISO-863. The project entered the queue on May 29, 2019, and has a proposed commercial operation date of February 1, 2026. Its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Highbanks Solar operating plant (EIA ID 65934). The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Livingston

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Highbanks Solar LLC

Utility

RG&E

Entity

NYISO

Service Type

Point of Interconnection

S158 High banks 34.5 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
NYISO Zone C
Hub Confidence
MEDIUM
Nearest Node (Estimated)
23768
POI Substation
NEG CENTRAL___INDECK

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.