Rosalen Solar Energy Center
200 MW hybrid in Wayne, NY · In queue since August 2024 · Proposed COD November 2029
200 MW
Capacity
1
Components
Solar
1y 9m
In Queue
—
IA Status
COD target: 2029
Total Duration
5y 3m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-11-01
The Rosalen Solar Energy Center is a proposed 200 MW hybrid solar and battery energy storage project located in Wayne County, New York. Developed by EDF Renewables Development, Inc., the project consists of 200 MW of solar generation. It is currently active in the NYISO interconnection queue as entry NYISO-C24-043, with a queue entry date of August 1, 2024, and a proposed commercial operation date of November 1, 2029.
The point of interconnection is the 345kV PM2 line between Pannell and Clay. The project is under review by the New York Independent System Operator (NYISO) and is planned to connect to the New York Power Authority (NYPA) grid. The Rosalen Solar Energy Center has appeared in recent news coverage regarding renewable energy development in New York State.
Generated from interconnection queue and public data sources
State
NY
County
Wayne
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
EDF Renewables Development, Inc.
Utility
NYPA
Entity
NYISO
Service Type
—
Point of Interconnection
345kV PM2 between Pannell-Clay
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- ZONE B
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.