Arch 1 (NYISO-C24-086) — Project Summary

Queue ID
NYISO-C24-086
Capacity
100 MW
Technology
Battery
Status
active
Location
Orange, NY
Region
NYISO
Developer
Terra-Gen Development, LLC
IA Status

Arch 1

NYISO-C24-086BetaActiveBatteryNYISOLBNL

100 MW storage in Orange, NY · In queue since August 2024 · Proposed COD December 2028

100 MW

Capacity

1

Components

Battery

1y 9m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

4y 4m

Pre-Study0%
Queue EntryAug 9, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

About

Arch 1 is a proposed 100 MW battery storage project located in Orange County, New York. Developed by Terra-Gen Development, LLC, the project consists of a single 100 MW battery component. It is currently active in the New York Independent System Operator (NYISO) interconnection queue as entry NYISO-C24-086, with a queue entry date of August 9, 2024, and a proposed commercial operation date of December 1, 2028. The point of interconnection is the Rock Tavern 345kV Substation (South position), and the interconnecting utility is CHGE.

The Arch 1 project has been the subject of recent news coverage, with six articles categorized as relating to industry, grid, and regulatory matters.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Orange

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Terra-Gen Development, LLC

Utility

CHGE

Entity

NYISO

Service Type

Point of Interconnection

Rock Tavern 345kV Substation (South position)

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE G
Hub Confidence
HIGH
POI Substation
Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Arch 1