Marble River Storage (NYISO-C24-136) — Project Summary

Queue ID
NYISO-C24-136
Capacity
160 MW
Technology
Battery
Status
active
Location
Clinton, NY
Region
NYISO
Developer
Emeren US, LLC
IA Status

Marble River Storage

NYISO-C24-136BetaActiveBatteryNYISOLBNL

160 MW storage in Clinton, NY · In queue since September 2024 · Proposed COD December 2028

160 MW

Capacity

1

Components

Battery

1y 8m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

4y 3m

Pre-Study0%
Queue EntrySep 6, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

About

The Marble River Storage project is a proposed 160 MW battery storage project located in Clinton County, New York. Developed by Emeren US, LLC, the project is interconnected to the NYISO grid at the Ryan 230kV Substation. It entered the NYISO interconnection queue (queue ID NYISO-C24-136) on September 6, 2024, and has a proposed commercial operation date of December 1, 2028.

The project is currently listed as active in the interconnection queue. The designated utility is NYPA, and the project consists solely of 160 MW of battery storage capacity. The Marble River Storage project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Clinton

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Emeren US, LLC

Utility

NYPA

Entity

NYISO

Service Type

Point of Interconnection

Ryan 230kV Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE D
Hub Confidence
HIGH
POI Substation
Ryan Road Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Marble River Storage