Manchester Solar
20 MW generation in Ontario, NY · In queue since September 2024 · Proposed COD September 2027
20 MW
Capacity
1
Components
Solar
1y 8m
In Queue
—
IA Status
COD target: 2027
Total Duration
3 years
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-01
Manchester Solar is a proposed 20 MW solar generation project located in Ontario County, New York. The project, developed by Manchester Solar NY LLC, is interconnected within the New York Independent System Operator (NYISO) queue under queue ID NYISO-C24-149, with an interconnection queue entry date of September 11, 2024. The proposed commercial operation date is September 1, 2027.
The project is linked to the existing SunEast Manchester Solar Project operating plant (EIA plant ID 64037).
Generated from interconnection queue and public data sources
State
NY
County
Ontario
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Manchester Solar NY LLC
Utility
NM-NG
Entity
NYISO
Service Type
—
Point of Interconnection
Station 127(Hooks Rd)-Elbridge Line 7 115kV
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- NYISO Zone B
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- 345032
- POI Substation
- STA_168_34_KV_BK1_2_REV_LBMP_B
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Manchester Solar