Chinook Energy Storage Center (NYISO-C24-153) — Project Summary

Queue ID
NYISO-C24-153
Capacity
500 MW
Technology
Battery
Status
active
Location
Lewis, NY
Region
NYISO
Developer
Hydrostor USA Holdings, Inc , a subsidiary of Hydrostor Inc
IA Status

Chinook Energy Storage Center

NYISO-C24-153BetaActiveBatteryNYISOLBNL

500 MW storage in Lewis, NY · In queue since September 2024 · Proposed COD December 2029

500 MW

Capacity

1

Components

Battery

1y 8m

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

5y 3m

Pre-Study0%
Queue EntrySep 11, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

About

The Chinook Energy Storage Center is a proposed 500 MW battery storage project located in Lewis County, New York. Developed by Hydrostor USA Holdings, Inc, a subsidiary of Hydrostor Inc, the project is currently active in the New York Independent System Operator (NYISO) interconnection queue as entry NYISO-C24-153, with a queue entry date of September 11, 2024. The proposed commercial operation date is December 1, 2029.

The project is planned to interconnect at the Adirondack - Austin Road Line #13, 345kV line.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Lewis

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Hydrostor USA Holdings, Inc , a subsidiary of Hydrostor Inc

Utility

NM-NG

Entity

NYISO

Service Type

Point of Interconnection

Adirondack - Austin Road Line #13, 345kV line.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE D
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Chinook Energy Storage Center