Fuller Storage (NYISO-C24-157) — Project Summary

Queue ID
NYISO-C24-157
Capacity
20 MW
Technology
Battery
Status
active
Location
Orange, NY
Region
NYISO
Developer
Granada Solar, LLC
IA Status

Fuller Storage

NYISO-C24-157BetaActiveBatteryNYISOLBNL

20 MW storage in Orange, NY · In queue since September 2024 · Proposed COD August 2028

20 MW

Capacity

1

Components

Battery

1y 8m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 11m

Pre-Study0%
Queue EntrySep 12, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-08-01

About

The Fuller Storage project is a proposed 20 MW battery storage project located in Orange County, New York. Developed by Granada Solar, LLC, the project is interconnected to the Central Hudson Gas & Electric (CHGE) grid at the East Walden 115 kV Substation. It is listed in the New York Independent System Operator (NYISO) interconnection queue as project number NYISO-C24-157, with an entry date of September 12, 2024.

The proposed commercial operation date for the Fuller Storage project is August 1, 2028. The project consists of 20 MW of battery storage capacity. The project is currently listed as active in the NYISO interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Orange

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Granada Solar, LLC

Utility

CHGE

Entity

NYISO

Service Type

Point of Interconnection

East Walden 1115 kV Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE G
Hub Confidence
HIGH
Nearest Node (Estimated)
E.WALDEN_115_KV_TR_1_REV_LBMP_G
POI Substation
East Walden Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.