Zenith BESS (NYISO-C24-170) — Project Summary

Queue ID
NYISO-C24-170
Capacity
165 MW
Technology
Battery
Status
active
Location
Onondaga, NY
Region
NYISO
Developer
Zenith Power LLC
IA Status

Zenith BESS

NYISO-C24-170BetaActiveBatteryNYISOLBNL

165 MW storage in Onondaga, NY · In queue since September 2024 · Proposed COD October 2029

165 MW

Capacity

1

Components

Battery

1y 8m

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

5y 1m

Pre-Study0%
Queue EntrySep 17, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-01

About

Zenith Power LLC is proposing the Zenith BESS project, a 165 MW battery storage development in Onondaga County, New York. The project is located within the NYISO region and interconnected to the Geres Lock-Tilden Line 16 115kV.

The Zenith BESS project entered the NYISO interconnection queue as project number NYISO-C24-170 on September 17, 2024. Its proposed commercial operation date is October 1, 2029. The project is currently listed as active in the queue.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Onondaga

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Zenith Power LLC

Utility

NM-NG

Entity

NYISO

Service Type

Point of Interconnection

Geres Lock-Tilden Line 16 115kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE C
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.