North Chelsea (Fieldstone Power Station)
150 MW storage in Dutchess, NY · In queue since September 2024 · Proposed COD May 2028
150 MW
Capacity
1
Components
Battery
1y 8m
In Queue
—
IA Status
COD target: 2028
Total Duration
3y 8m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-01
The North Chelsea (Fieldstone Power Station) is a proposed 150 MW battery storage project located in Dutchess County, New York. Developed by Fieldstone Power Station LLC, the project consists of a 150 MW battery component. It is listed in the NYISO interconnection queue as entry NYISO-C24-171, with a queue entry date of September 17, 2024, and a proposed commercial operation date of May 1, 2028. The point of interconnection is the North Chelsea 115 kV Substation.
The proposed project is currently listed as active in the NYISO interconnection queue.
Generated from interconnection queue and public data sources
State
NY
County
Dutchess
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Fieldstone Power Station LLC
Utility
CHGE
Entity
NYISO
Service Type
—
Point of Interconnection
North Chelsea 115 kV Substation
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- ZONE G
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- NCHELSEA_115KV_TR2
- POI Substation
- North Chelsea Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about North Chelsea (Fieldstone Power Station)