Commack(Jericho Power Station) (NYISO-C24-177) — Project Summary

Queue ID
NYISO-C24-177
Capacity
35 MW
Technology
Battery
Status
active
Location
Suffolk, NY
Region
NYISO
Developer
Jericho Power Station LLC
IA Status

Commack(Jericho Power Station)

NYISO-C24-177BetaActiveBatteryNYISOLBNL

35 MW storage in Suffolk, NY · In queue since September 2024 · Proposed COD May 2028

35 MW

Capacity

1

Components

Battery

1y 8m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 8m

Pre-Study0%
Queue EntrySep 17, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-01

About

The Commack (Jericho Power Station) project is a proposed 35 MW battery storage project located in Suffolk County, New York. Developed by Jericho Power Station LLC, the project is interconnected to the Long Island Power Authority (LIPA) via the Commack 69 kV Substation. It is listed in the New York Independent System Operator (NYISO) interconnection queue as entry NYISO-C24-177, with a queue entry date of September 17, 2024, and a proposed commercial operation date of May 1, 2028.

The project consists of 35 MW of battery storage capacity. The Commack (Jericho Power Station) project is linked to the existing Jericho Power Station. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Suffolk

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Jericho Power Station LLC

Utility

LIPA

Entity

NYISO

Service Type

Point of Interconnection

Commack 69 kV Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE K
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.