Wheelhouse Solar Energy Center (NYISO-C24-188) — Project Summary

Queue ID
NYISO-C24-188
Capacity
350 MW
Technology
Solar+Battery
Status
active
Location
Herkimer, NY
Region
NYISO
Developer
Wheelhouse Solar Energy Center, LLC
IA Status

Wheelhouse Solar Energy Center

NYISO-C24-188BetaActiveSolarBatteryNYISOLBNL

350 MW hybrid in Herkimer, NY · In queue since September 2024 · Proposed COD December 2029

350 MW

Capacity

1

Components

Solar

1y 8m

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

5y 3m

Pre-Study0%
Queue EntrySep 18, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

About

The Wheelhouse Solar Energy Center is a proposed 350 MW hybrid solar and battery project located in Herkimer County, New York. Developed by Wheelhouse Solar Energy Center, LLC, the project consists of 350 MW of solar generation. It is interconnected to the NYISO grid under queue ID NYISO-C24-188, with a queue entry date of September 18, 2024, and a proposed commercial operation date of December 1, 2029.

The proposed project is currently in the active stage of the interconnection queue. The point of interconnection is the Edic 345 kV (137200) to Princetown 345 kV (148965) southern circuit #352. The utility is NYPA, and the entity is NYISO. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Herkimer

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Wheelhouse Solar Energy Center, LLC

Utility

NYPA

Entity

NYISO

Service Type

Point of Interconnection

Edic 345 kV (137200) to Princetown 345 kV (148965) southern circuit #352

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE E
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Wheelhouse Solar Energy Center