Trelina Energy Storage (NYISO-C24-207) — Project Summary

Queue ID
NYISO-C24-207
Capacity
120 MW
Technology
Battery
Status
active
Location
Seneca, NY
Region
NYISO
Developer
NextEra Energy Resources Interconnection Holdings, LLC
IA Status

Trelina Energy Storage

NYISO-C24-207BetaActiveBatteryNYISOLBNL + Live

120 MW storage in Seneca, NY · In queue since September 2024 · Proposed COD December 2029

120 MW

Capacity

1

Components

Battery

1y 8m

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

5y 3m

Pre-Study0%
Queue EntrySep 19, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

About

The Trelina Energy Storage project is a proposed 120 MW battery storage project located in Seneca County, New York. It is being developed by NextEra Energy Resources Interconnection Holdings, LLC and is interconnected to the New York State Electric and Gas (NYSEG) utility. The project entered the New York Independent System Operator (NYISO) interconnection queue as queue ID NYISO-C24-207 on September 19, 2024, with a proposed commercial operation date of December 1, 2029.

The point of interconnection (POI) is the Planned Q720 Trelina Solar Switchyard on the Border City to Station 168 115 kV line. The project is currently listed as active in the NYISO interconnection queue. Recent news coverage has discussed the development.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Seneca

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

NextEra Energy Resources Interconnection Holdings, LLC

Utility

NYSEG

Entity

NYISO

Service Type

Point of Interconnection

Planned Q720 Trelina Solar Switchyard on Border City to Station 168 115 kV line

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE B
Hub Confidence
HIGH
Nearest Node (Estimated)
STA_168_34_KV_BK1_2_REV_LBMP_B
POI Substation
Station 168

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.