Southampton Power Station Battery Energy Storage System (BESS) (NYISO-C24-274) — Project Summary

Queue ID
NYISO-C24-274
Capacity
31.96 MW
Technology
Battery
Status
active
Location
Suffolk, NY
Region
NYISO
Developer
National Grid Generation LLC
IA Status

Southampton Power Station Battery Energy Storage System (BESS)

NYISO-C24-274BetaActiveBatteryNYISOLBNL

31.96 MW storage in Suffolk, NY · In queue since September 2024 · Proposed COD December 2027

31.96 MW

Capacity

1

Components

Battery

1y 8m

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

3y 3m

Pre-Study0%
Queue EntrySep 24, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

The Southampton Power Station Battery Energy Storage System (BESS) is a proposed 31.96 MW battery storage project located in Suffolk County, New York. The project, developed by National Grid Generation LLC, is interconnected to the Long Island Power Authority (LIPA) grid at the Southampton 69kV point of interconnection.

The project is listed in the New York Independent System Operator (NYISO) interconnection queue as entry NYISO-C24-274, with a queue entry date of September 24, 2024, and a proposed commercial operation date of December 1, 2027.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Suffolk

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

National Grid Generation LLC

Utility

LIPA

Entity

NYISO

Service Type

Point of Interconnection

Southampton 69kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE K
Hub Confidence
HIGH
POI Substation
Southampton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.