Wading River Power Station Battery Energy Storage System (BESS) (NYISO-C24-280) — Project Summary

Queue ID
NYISO-C24-280
Capacity
50 MW
Technology
Battery
Status
active
Location
Suffolk, NY
Region
NYISO
Developer
National Grid Generation LLC
IA Status

Wading River Power Station Battery Energy Storage System (BESS)

NYISO-C24-280BetaActiveBatteryNYISOLBNL

50 MW storage in Suffolk, NY · In queue since September 2024 · Proposed COD December 2027

50 MW

Capacity

1

Components

Battery

1y 8m

In Queue

IA Status

COD target: 2027

Status
Latest milestonespecial permit requestedRiverhead News Review · 2025-04-23
Interconnection

Total Duration

3y 3m

Pre-Study0%
Queue EntrySep 24, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

The Wading River Power Station Battery Energy Storage System (BESS) is a proposed 50 MW battery storage project located in Suffolk County, New York. The project, developed by National Grid Generation LLC, is interconnected to the NYISO grid under queue ID NYISO-C24-280. The project entered the queue on September 24, 2024, and has a proposed commercial operation date of December 1, 2027. The point of interconnection is the Wading River 138 kV Substation.

The proposed project is linked to the existing Wading River Power Station and has been featured in recent news coverage regarding its development. The project consists of 50 MW of battery storage capacity.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Suffolk

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

National Grid Generation LLC

Utility

LIPA

Entity

NYISO

Service Type

Point of Interconnection

Wading River 138 kV Substation

Data Source

LBNL

DeveloperRhynland EnergyRiverhead News Review · 2025-04-23
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE K
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WADING RIVER_IC_1
POI Substation
WADING RIVER_IC_1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26

View all articles