Southport Solar PV Project (NYISO-C24-313) — Project Summary

Queue ID
NYISO-C24-313
Capacity
42 MW
Technology
Solar
Status
active
Location
Chemung, NY
Region
NYISO
Developer
NY Power Authority
IA Status

Southport Solar PV Project

NYISO-C24-313BetaActiveSolarNYISOLBNL

42 MW generation in Chemung, NY · In queue since October 2024 · Proposed COD November 2028

42 MW

Capacity

1

Components

Solar

1y 7m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

4y 1m

Pre-Study0%
Queue EntryOct 2, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-11-01

About

The Southport Solar PV Project is a proposed 42 MW solar generation project located in Chemung County, New York. Developed by the NY Power Authority, the project is interconnected to the NYSEG utility via the Caton Ave. 115 kV Station. It is currently listed as active in the NYISO interconnection queue under queue ID NYISO-C24-313, with an entry date of October 2, 2024, and a proposed commercial operation date of November 1, 2028.

The proposed project consists of 42 MW of solar photovoltaic (PV) generation capacity. It is currently in the NYISO interconnection queue, but has not yet reached the interconnection agreement (IA) stage. The Southport Solar PV Project has appeared in recent news coverage regarding renewable energy developments in New York State.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Chemung

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

NY Power Authority

Utility

NYSEG

Entity

NYISO

Service Type

Point of Interconnection

Caton Ave. 115 kV Station

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE B
Hub Confidence
HIGH
Nearest Node (Estimated)
ELM_ST_23_KV_LD_REV_LBMP_A
POI Substation
Station 2

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Southport Solar PV Project