Leo Energy Storage (NYISO-C24-317) — Project Summary

Queue ID
NYISO-C24-317
Capacity
75 MW
Technology
Battery
Status
active
Location
Clinton, NY
Region
NYISO
Developer
BGTF US Development Holdings LLC
IA Status

Leo Energy Storage

NYISO-C24-317BetaActiveBatteryNYISOLBNL + Live

75 MW storage in Clinton, NY · In queue since October 2024 · Proposed COD December 2028

75 MW

Capacity

1

Components

Battery

1y 7m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

4y 2m

Pre-Study0%
Queue EntryOct 3, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

About

The Leo Energy Storage project is a proposed 75 MW battery storage project located in Clinton County, New York. Developed by BGTF US Development Holdings LLC, the project is interconnected to the New York Independent System Operator (NYISO) via the Lyon Mountain 115 kV Substation. Designated as queue ID NYISO-C24-317, the project entered the interconnection queue on October 3, 2024, with a proposed commercial operation date of December 1, 2028.

The project is currently listed as active in the NYISO interconnection queue. It is a standalone energy storage project consisting of 75 MW of battery capacity. The utility for the project is New York State Electric and Gas (NYSEG). The Leo Energy Storage project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Clinton

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

BGTF US Development Holdings LLC

Utility

NYSEG

Entity

NYISO

Service Type

Point of Interconnection

Lyon Mountain 115 kV Substation

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE D
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Leo Energy Storage