Rolling Upland Wind Farm (NYISO-C24-322) — Project Summary

Queue ID
NYISO-C24-322
Capacity
79.8 MW
Technology
Wind
Status
active
Location
Madison, NY
Region
NYISO
Developer
Rolling Upland Wind Farm LLC
IA Status

Rolling Upland Wind Farm

NYISO-C24-322BetaActiveWindNYISOLBNL

79.8 MW generation in Madison, NY · In queue since October 2024 · Proposed COD October 2029

79.8 MW

Capacity

1

Components

Wind

1y 7m

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

5 years

Pre-Study0%
Queue EntryOct 7, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-01

About

The proposed Rolling Upland Wind Farm is a 79.8 MW wind energy generation project located in Madison County, New York. Developed by Rolling Upland Wind Farm LLC, the project consists of 79.8 MW of wind capacity. It is listed in the NYISO interconnection queue as entry NYISO-C24-322, with a queue entry date of October 7, 2024, and a proposed commercial operation date of October 1, 2029. The point of interconnection is the County Line-Brothertown 115kV line, and the project is interconnected with NYSEG.

The Rolling Upland Wind Farm project has been mentioned in recent industry news articles.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Madison

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Rolling Upland Wind Farm LLC

Utility

NYSEG

Entity

NYISO

Service Type

Point of Interconnection

County Line-Brothertown 115kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE C
Hub Confidence
HIGH
POI Substation
Ross County Solar Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Rolling Upland Wind Farm