Pouch Energy Storage System
47.1 MW storage in Kings, NY · In queue since October 2024 · Proposed COD December 2030
47.1 MW
Capacity
1
Components
Battery
1y 7m
In Queue
—
IA Status
COD target: 2030
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-12-01
The Pouch Energy Storage System is a proposed 47.1 MW battery storage project located in Kings County, New York. The developer is the NY Power Authority, and the project is interconnected with ConEd. It is listed in the NYISO interconnection queue as entry NYISO-C24-333, with a queue entry date of October 9, 2024, and a proposed commercial operation date of December 1, 2030.
The project is currently listed as active in the interconnection queue. The point of interconnection is the Fox Hills 138kV Substation. The proposed project has appeared in recent news.
Generated from interconnection queue and public data sources
State
NY
County
Kings
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
the NY Power Authority
Utility
ConEd
Entity
NYISO
Service Type
—
Point of Interconnection
Fox Hills 138kV Substation
Data Source
LBNL + Live
- ISO / RTO
- NYISO
- Trading Hub
- ZONE J
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Pouch Energy Storage System