Green Isles Energy Storage (NYISO-C24-351) — Project Summary

Queue ID
NYISO-C24-351
Capacity
400 MW
Technology
Battery
Status
active
Location
Suffolk, NY
Region
NYISO
Developer
CEDAR HOLDCO LLC
IA Status

Green Isles Energy Storage

NYISO-C24-351BetaActiveBatteryNYISOLBNL

400 MW storage in Suffolk, NY · In queue since October 2024 · Proposed COD December 2029

400 MW

Capacity

1

Components

Battery

1y 7m

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

5y 2m

Pre-Study0%
Queue EntryOct 15, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

About

Green Isles Energy Storage is a proposed 400 MW battery storage project located in Suffolk County, New York. The project, developed by CEDAR HOLDCO LLC, is in the New York Independent System Operator (NYISO) interconnection queue as entry NYISO-C24-351, with a queue entry date of October 15, 2024. The proposed commercial operation date is December 1, 2029. The point of interconnection is the Brookhaven - Sills Rd 138 kV Circuit #1.

The project is currently listed as active in the interconnection queue and has been the subject of recent news coverage. It is intended to connect to the Long Island Power Authority (LIPA) grid.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Suffolk

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

CEDAR HOLDCO LLC

Utility

LIPA

Entity

NYISO

Service Type

Point of Interconnection

Brookhaven - Sills Rd 138 kV Circuit #1

Data Source

LBNL

Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE K
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Green Isles Energy Storage