KCE NY 29
79 MW storage in Suffolk, NY · In queue since October 2024 · Proposed COD October 2027
79 MW
Capacity
1
Components
Battery
1y 7m
In Queue
—
IA Status
COD target: 2027
Total Duration
3 years
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-01
KCE NY 29 is a proposed 79 MW battery storage project located in Suffolk County, New York. The project, developed by KCE NY 29, LLC, is interconnected with the Long Island Power Authority (LIPA) and participates in the New York Independent System Operator (NYISO) interconnection queue under queue ID NYISO-CR24-1005. The project entered the queue on October 15, 2024, with a proposed commercial operation date of October 1, 2027. The point of interconnection is at the Kings 138 kV substation.
The project is linked to the existing operating plant KCE NY 29, LLC (EIA plant ID 66862).
Generated from interconnection queue and public data sources
State
NY
County
Suffolk
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
KCE NY 29, LLC
Utility
LIPA
Entity
NYISO
Service Type
—
Point of Interconnection
Kings 138 kV
Data Source
LBNL
- ISO / RTO
- NYISO
- Trading Hub
- NYISO Zone K
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- 24164
- POI Substation
- NYPA_BRENTWD_____GT
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.