Taylor Creek Two
60 MW generation in Orange, FL · In queue since February 2024 · Proposed COD December 2026
60 MW
Capacity
1
Components
Solar
2y 3m
In Queue
System Impact Study
IA Status
COD target: 2026
Total Duration
2y 10m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-01
Taylor Creek Two is a proposed 60 MW solar generation project located in Orange County, Florida. The project is being developed by Orlando Utilities Commission (OUC). It entered the OUC interconnection queue as queue ID OUC-202313 on February 14, 2024. The proposed commercial operation date is December 1, 2026. The project's interconnection status is currently in the System Impact Study phase.
The proposed project is interconnected at the Stanton - Indian River 115 kV point of interconnection. Taylor Creek Two has been mentioned in recent news coverage related to the electric grid.
Generated from interconnection queue and public data sources
State
FL
County
Orange
Grid Region
Southeast
Market
—
Developer
—
Utility
Orlando Utilities Commission
Entity
OUC
Service Type
—
Point of Interconnection
Stanton - Indian River 115 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.