PacifiCorp-C2-156
175 MW hybrid in Linn, OR · In queue since May 2022 · Proposed COD December 2026
175 MW
Capacity
1
Components
Solar
4 years
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
4y 7m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-01
PacifiCorp-C2-156 is a proposed 175 MW hybrid solar and battery project located in Linn County, Oregon. The development project consists of 175 MW of solar capacity. It is listed in the PacifiCorp interconnection queue (queue entry date: May 15, 2022) with a proposed commercial operation date of December 1, 2026. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the Alvey-Fry transmission line.
Generated from interconnection queue and public data sources
State
OR
County
Linn
Grid Region
Mountain West
Market
—
Developer
—
Utility
PacifiCorp
Entity
PacifiCorp
Service Type
—
Point of Interconnection
Alvey-Fry transmission line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.