Project PacifiCorp-C4-012 — Project Summary

Queue ID
PacifiCorp-C4-012
Capacity
197.8 MW
Technology
Solar+Battery
Status
active
Location
Iron, UT
Region
West
Developer
IA Status

PacifiCorp-C4-012

PacifiCorp-C4-012BetaActiveSolarBatteryPacifiCorpLBNL

197.8 MW hybrid in Iron, UT · In queue since April 2024 · Proposed COD May 2027

197.8 MW

Capacity

1

Components

Solar

2y 1m

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

3y 1m

Pre-Study0%
Queue EntryApr 30, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-31

About

PacifiCorp-C4-012 is a proposed 197.8 MW hybrid solar and battery project located in Iron County, Utah. The development project consists of 197.8 MW of solar capacity. It is listed in the PacifiCorp interconnection queue as of April 30, 2024, with a proposed commercial operation date of May 31, 2027. The point of interconnection is the Sigurd Three Peaks transmission line.

The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

UT

County

Iron

Grid Region

Mountain West

Market

Developer

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

Point of Interconnection

Sigurd Three Peaks transmission line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.