PacifiCorp-C4-014
1.8 MW generation in Multnomah, OR · In queue since May 2024 · Proposed COD September 2026
1.8 MW
Capacity
1
Components
Solar
2 years
In Queue
—
IA Status
COD target: 2026
Total Duration
2y 4m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-09-01
PacifiCorp-C4-014 is a proposed solar generation project located in Multnomah County, Oregon, with a total capacity of 1.8 MW. The project consists of 1.8 MW of solar photovoltaic generation. It is listed as active in the PacifiCorp interconnection queue, with an entry date of May 6, 2024, and a proposed commercial operation date of September 1, 2026.
The point of interconnection (POI) for PacifiCorp-C4-014 is Circuit 5P478 out of the Columbia substation. The project is being developed by PacifiCorp.
Generated from interconnection queue and public data sources
State
OR
County
Multnomah
Grid Region
Mountain West
Market
—
Developer
—
Utility
PacifiCorp
Entity
PacifiCorp
Service Type
—
Point of Interconnection
Circuit 5P478 out of Columbia substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PacifiCorp-C4-014