0.36 MW generation in Deschutes, OR · In queue since May 2024
0.36 MW
Capacity
1
Components
Solar
2 years
In Queue
—
IA Status
Total Duration
2 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
PacifiCorp-C4-117 is a proposed solar generation project located in Deschutes County, Oregon, with a total capacity of 0.36 MW. The project consists of a single 0.36 MW solar component. It is interconnected to the PacifiCorp system via Circuit 5D22 out of the Redmond substation.
The project is currently active in the PacifiCorp interconnection queue, with an entry date of May 15, 2024.
Generated from interconnection queue and public data sources
State
OR
County
Deschutes
Grid Region
Mountain West
Market
—
Developer
—
Utility
PacifiCorp
Entity
PacifiCorp
Service Type
—
Point of Interconnection
Circuit 5D22 out of Redmond substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.