PacifiCorp-PIS038
150 MW hybrid in Cache, UT · In queue since May 2023 · Proposed COD October 2026
150 MW
Capacity
1
Components
Solar
3 years
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
3y 5m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-10-31
PacifiCorp-PIS038 is a proposed 150 MW hybrid solar and battery project located in Cache County, Utah. The project, under development by PacifiCorp, consists of 150 MW of solar generation. It is listed in the PacifiCorp interconnection queue as of May 10, 2023, with a proposed commercial operation date of October 31, 2026. The interconnection status is currently "In Progress (unknown study)" and the point of interconnection is the Bridgerland-Cache transmission line.
The project is located in the western region of the United States. It is designated as a hybrid project due to its combination of solar and battery technologies. The interconnection agreement is currently in progress, but the specific study being conducted is not identified in the data.
Generated from interconnection queue and public data sources
State
UT
County
Cache
Grid Region
Mountain West
Market
—
Developer
—
Utility
PacifiCorp
Entity
PacifiCorp
Service Type
—
Point of Interconnection
Bridgerland-Cache transmission line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PacifiCorp-PIS038