Project PGE-07-024 * — Project Summary

Queue ID
PGE-07-024 *
Capacity
100 MW
Technology
Gas
Status
suspended
Location
Columbia, OR
Region
West
Developer
IA Status
Suspended

PGE-07-024 *

PGE-07-024 *BetaSuspendedGasPGELBNL

100 MW generation in Columbia, OR · In queue since October 2007 · Proposed COD December 2011

100 MW

Capacity

1

Components

Gas

18y 7m

In Queue

Suspended

IA Status

COD target: 2011

Interconnection

Total Duration

4y 2m

Suspended38%
Queue EntryOct 9, 2007

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2011-12-01

About

The proposed project PGE-07-024 * is a 100 MW gas-fired generation project located in Columbia County, Oregon. The developer is Portland General Electric (PGE). It consists of a single 100 MW gas component.

The project is in the Portland General Electric interconnection queue, with an original queue entry date of October 9, 2007. The proposed commercial operation date was December 1, 2011. The interconnection agreement status is currently listed as Suspended. The point of interconnection is the PGE Beaver Generation Site.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Columbia

Grid Region

Mountain West

Market

Developer

Utility

Portland General Electric

Entity

PGE

Service Type

Point of Interconnection

PGE Beaver Generation Site

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PGE-07-024 *