PGE-07-024 *
100 MW generation in Columbia, OR · In queue since October 2007 · Proposed COD December 2011
100 MW
Capacity
1
Components
Gas
18y 7m
In Queue
Suspended
IA Status
COD target: 2011
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2011-12-01
The proposed project PGE-07-024 * is a 100 MW gas-fired generation project located in Columbia County, Oregon. The developer is Portland General Electric (PGE). It consists of a single 100 MW gas component.
The project is in the Portland General Electric interconnection queue, with an original queue entry date of October 9, 2007. The proposed commercial operation date was December 1, 2011. The interconnection agreement status is currently listed as Suspended. The point of interconnection is the PGE Beaver Generation Site.
Generated from interconnection queue and public data sources
State
OR
County
Columbia
Grid Region
Mountain West
Market
—
Developer
—
Utility
Portland General Electric
Entity
PGE
Service Type
—
Point of Interconnection
PGE Beaver Generation Site
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.