Project PGE-12-053 — Project Summary

Queue ID
PGE-12-053
Capacity
87.5 MW
Technology
Wind
Status
suspended
Location
Polk, OR
Region
West
Developer
IA Status
Suspended

PGE-12-053

PGE-12-053BetaSuspendedWindPGELBNL

87.5 MW generation in Polk, OR · In queue since October 2012 · Proposed COD December 2015

87.5 MW

Capacity

1

Components

Wind

13y 7m

In Queue

Suspended

IA Status

COD target: 2015

Interconnection

Total Duration

3y 2m

Suspended38%
Queue EntryOct 25, 2012

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2015-12-01

About

PGE-12-053 is a proposed wind energy project located in Polk County, Oregon, with a total capacity of 87.5 MW. The project, consisting entirely of wind generation, is in the Portland General Electric (PGE) interconnection queue. Its point of interconnection is the Grand Ronde - Willamina 57 kV Switching Station.

The project entered the queue on October 25, 2012, with a proposed commercial operation date of December 1, 2015. Its interconnection agreement status is currently listed as suspended.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Polk

Grid Region

Mountain West

Market

Developer

Utility

Portland General Electric

Entity

PGE

Service Type

Point of Interconnection

Grand Ronde - Willamina 57 kV Switching Station

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PGE-12-053