Project PGE-23-224 — Project Summary

Queue ID
PGE-23-224
Capacity
200 MW
Technology
Wind
Status
active
Location
Columbia, OR
Region
West
Developer
IA Status
In Progress (unknown study)

PGE-23-224

PGE-23-224BetaActiveWindPGELBNL

200 MW generation in Columbia, OR · In queue since March 2023 · Proposed COD September 2028

200 MW

Capacity

1

Components

Wind

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2028

Interconnection

Total Duration

5y 6m

In Study38%
Queue EntryMar 3, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-01

About

PGE-23-224 is a proposed 200 MW wind generation project located in Columbia County, Oregon. The project, under development by Portland General Electric (PGE), entered the PGE interconnection queue on March 3, 2023, with a proposed commercial operation date of September 1, 2028. The point of interconnection is the Trojan to Harborton 230kV line.

The project's interconnection status is listed as "In Progress (unknown study)". Recent news coverage indicates public interest in the development.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Columbia

Grid Region

Mountain West

Market

Developer

Utility

Portland General Electric

Entity

PGE

Service Type

Point of Interconnection

Trojan to Harborton 230kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.