Waypost Solar Project
92 MW generation in Caroline, MD · In queue since February 2016 · Proposed COD December 2026
92 MW
Capacity
1
Components
Solar
10y 3m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
10y 10m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2026-12-31
The Waypost Solar Project is a proposed 92 MW solar generation project located in Caroline County, Maryland. The project is in the PJM interconnection queue as entry AB2-036, with a queue entry date of February 26, 2016. The proposed commercial operation date is December 31, 2026.
The interconnection agreement for the Waypost Solar Project has been executed. The interconnecting utility is Delmarva Power & Light (DPL). The project's point of interconnection is the Church - Oil City 138kV line. The project's status is currently listed as suspended.
Generated from interconnection queue and public data sources
State
MD
County
Caroline
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
—
Point of Interconnection
Church - Oil City 138kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Waypost Solar Project