Morgnec Road Solar
55.8 MW generation in Kent, MD · In queue since April 2016 · Proposed COD July 2026
55.8 MW
Capacity
1
Components
Solar
10y 1m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
10y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-07-31
The Morgnec Road Solar project is a proposed 55.8 MW solar generation facility in Kent County, Maryland. The project is interconnected within the PJM Interconnection queue as entry PJM-AB2-133, with a queue entry date of April 29, 2016. The proposed commercial operation date is July 31, 2026, and the Interconnection Agreement (IA) has been executed.
The proposed project is linked to the existing Morgnec Solar operating plant (EIA ID 66843). The Morgnec Road Solar project has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
MD
County
Kent
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
—
Point of Interconnection
Chestertown-Church 69kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CHESTRTN
- POI Substation
- Chestertown Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26