Great Bend
48 MW generation in Meigs, OH · In queue since October 2016 · Proposed COD October 2025
48 MW
Capacity
1
Components
Solar
9y 7m
In Queue
IA Executed
IA Status
COD target: 2025
Total Duration
9 years
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2025-10-31
The Great Bend project is a proposed 48 MW solar generation project located in Meigs County, Ohio. The project is interconnected to the PJM grid under queue ID PJM-AC1-082. Its queue entry date is October 1, 2016, and the proposed commercial operation date is October 31, 2025. The interconnection agreement has been executed.
The project is linked to the existing Great Bend Solar Project operating plant (EIA ID 67834).
Generated from interconnection queue and public data sources
State
OH
County
Meigs
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Ravenswood-Hemlock 69kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- RAVENSWO 69 KV T1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Great Bend