Mark Center Solar Project (PJM-AC1-167) — Project Summary

Queue ID
PJM-AC1-167
Capacity
49.9 MW
Technology
Solar
Status
active
Location
Defiance, OH
Region
PJM
Developer
IA Status
IA Executed

Mark Center Solar Project

PJM-AC1-167BetaActiveSolarPJMLBNL + Live

49.9 MW generation in Defiance, OH · In queue since November 2016 · Proposed COD September 2026

49.9 MW

Capacity

1

Components

Solar

9y 6m

In Queue

IA Executed

IA Status

COD target: 2026

Interconnection

Total Duration

9y 10m

Construction75%
Queue EntryNov 1, 2016

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-09-30

About

The Mark Center Solar Project is a proposed 49.9 MW solar generation project located in Defiance County, Ohio. The project is in the PJM Interconnection queue as entry PJM-AC1-167, with a queue entry date of November 1, 2016. The proposed commercial operation date is September 30, 2026.

The project's interconnection agreement has been executed. The interconnecting utility is AEP. The point of interconnection is the Mark Center 69kV substation. The Mark Center Solar Project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Defiance

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Mark Center 69kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.