Vinton Solar
125 MW generation in Vinton, OH · In queue since October 2016 · Proposed COD January 2027
125 MW
Capacity
1
Components
Solar
9y 7m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
10y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-01-31
Vinton Solar is a proposed 125 MW solar generation project located in Vinton County, Ohio. The project is being developed within the PJM Interconnection region and is interconnected to the AEP utility grid at the Elk 138kV point of interconnection. The project entered the PJM queue as queue ID PJM-AC1-194 on October 31, 2016, and has a proposed commercial operation date of January 31, 2027. The interconnection agreement for Vinton Solar has been executed.
The Vinton Solar project has been the subject of recent news coverage, with seven articles categorized as regulatory (5) and industry (2).
Generated from interconnection queue and public data sources
State
OH
County
Vinton
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Elk 138kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ELKGARD2138 KV T1
- POI Substation
- Elk Garden Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesNo ask pi reports yet for this entity.
ask pi about Vinton Solar