Eaton OH Solar
49.9 MW generation in Preble, OH · In queue since February 2017 · Proposed COD January 2027
49.9 MW
Capacity
1
Components
Solar
9y 3m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
9y 11m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-01-28
The Eaton OH Solar project is a proposed 49.9 MW solar generation project located in Preble County, Ohio. The project is listed in the PJM interconnection queue as entry PJM-AC2-067, with a queue entry date of February 27, 2017. The proposed commercial operation date is January 28, 2027.
The interconnection agreement for the Eaton OH Solar project has been executed. The project is interconnected to the Dayton utility grid at the Camden-Crystal I 69kV point of interconnection.
Generated from interconnection queue and public data sources
State
OH
County
Preble
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dayton
Entity
PJM
Service Type
—
Point of Interconnection
Camden-Crystal I 69kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Eaton OH Solar