Firelands Wind
297.66 MW generation in Erie, OH · In queue since March 2017 · Proposed COD July 2027
297.66 MW
Capacity
1
Components
Wind
9y 2m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
10y 4m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–36 months
Proposed COD: 2027-07-30
Firelands Wind is a proposed wind generation project with a total capacity of 297.66 MW, located in Erie County, Ohio. The project is in the PJM interconnection queue as entry PJM-AC2-103, with a queue entry date of March 10, 2017, and a proposed commercial operation date of July 30, 2027. The interconnection agreement (IA) has been executed.
The project is interconnected to the ATSI utility system at the Beaver-Davis Besse 345 kV I point of interconnection. Firelands Wind has been the subject of recent news coverage, with 10 articles categorized as regulatory and industry news.
Generated from interconnection queue and public data sources
State
OH
County
Erie
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Beaver-Davis Besse 345 kV I
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Firelands Wind