Angelina Solar I (PJM-AC2-111) — Project Summary

Queue ID
PJM-AC2-111
Capacity
80 MW
Technology
Solar
Status
active
Location
Preble, OH
Region
PJM
Developer
IA Status
IA Executed

Angelina Solar I

PJM-AC2-111BetaActiveSolarPJMLBNL + Live

80 MW generation in Preble, OH · In queue since March 2017 · Proposed COD April 2027

80 MW

Capacity

1

Components

Solar

9y 2m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

10y 1m

Construction75%
Queue EntryMar 16, 2017

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-04-01

About

Angelina Solar I is a proposed 80 MW solar generation project located in Preble County, Ohio. The project is interconnected within the PJM Interconnection queue as entry PJM-AC2-111, with a queue entry date of March 16, 2017, and a proposed commercial operation date of April 1, 2027. The designated utility is AEP, and the point of interconnection is College Corner 138kV. The project's Interconnection Agreement (IA) has been executed.

The Angelina Solar I project has been the subject of recent news coverage, with two articles categorized as regulatory and industry news.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Preble

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

College Corner 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
POI Substation
AEP College Corner Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Angelina Solar I