Rochelle Solar
40 MW generation in Ogle, IL · In queue since April 2017 · Proposed COD May 2028
40 MW
Capacity
1
Components
Solar
9y 1m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
11y 1m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2028-05-27
The Rochelle Solar project is a proposed 40 MW solar generation project located in Ogle County, Illinois. The project is in the PJM interconnection queue as entry AD1-013, with a queue entry date of April 6, 2017, and a proposed commercial operation date of May 27, 2028. The interconnecting utility is ComEd.
The project's interconnection agreement has been executed. The point of interconnection is the Twombly Road 138kV substation. The project is currently listed as active in the PJM queue.
Generated from interconnection queue and public data sources
State
IL
County
Ogle
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Twombly Road 138kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.