Spring Grove Solar II (PJM-AD1-025) — Project Summary

Queue ID
PJM-AD1-025
Capacity
150 MW
Technology
Solar
Status
active
Location
Surry, VA
Region
PJM
Developer
IA Status
IA Executed

Spring Grove Solar II

PJM-AD1-025BetaActiveSolarPJMLBNL + Live

150 MW generation in Surry, VA · In queue since June 2017 · Proposed COD December 2025

150 MW

Capacity

1

Components

Solar

8y 11m

In Queue

IA Executed

IA Status

COD target: 2025

Interconnection

Total Duration

8y 6m

Schedule

4 months past proposed COD

Construction75%
Queue EntryJun 28, 2017

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2025-12-28

About

Spring Grove Solar II is a proposed 150 MW solar generation project located in Surry County, Virginia. The development project, under the queue ID PJM-AD1-025, is interconnected within the PJM Interconnection queue. Its queue entry date is June 28, 2017, with a proposed commercial operation date of December 28, 2025. The project's interconnection agreement has been executed.

The proposed project is linked to the existing Spring Grove Solar 2 operating plant (EIA ID 66844). Dominion is the utility associated with the project.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Surry

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Hopewell-Surry 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
6SURRY

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Spring Grove Solar II