Macadamia Solar
75 MW generation in Washington, NC · In queue since August 2017 · Proposed COD March 2028
75 MW
Capacity
1
Components
Solar
8y 9m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
10y 7m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2028-03-31
The Macadamia Solar project is a proposed 75 MW solar generation facility located in Washington County, North Carolina. The project is in the PJM interconnection queue as entry AD1-075, with a queue entry date of August 31, 2017. Dominion is the interconnecting utility.
The proposed commercial operation date for Macadamia Solar is March 31, 2028. The project's interconnection agreement has been executed. The point of interconnection is the Trowbridge 230 kV substation.
Generated from interconnection queue and public data sources
State
NC
County
Washington
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Trowbridge 230 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- POI Substation
- Trowbridge Substation