Sweet Sue Solar (PJM-AD1-105) — Project Summary

Queue ID
PJM-AD1-105
Capacity
74 MW
Technology
Solar
Status
active
Location
King William, VA
Region
PJM
Developer
IA Status
System Impact Study

Sweet Sue Solar

PJM-AD1-105BetaActiveSolarPJMLBNL + Live

74 MW generation in King William, VA · In queue since September 2017 · Proposed COD December 2026

74 MW

Capacity

1

Components

Solar

8y 8m

In Queue

System Impact Study

IA Status

COD target: 2026

Interconnection

Total Duration

9y 3m

Impact Study25%
Queue EntrySep 23, 2017

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

About

Sweet Sue Solar is a proposed 74 MW solar generation project located in King William County, Virginia. The project is in the PJM interconnection queue as entry PJM-AD1-105, with a queue entry date of September 23, 2017. The proposed commercial operation date is December 31, 2026. Dominion is the utility and the project's interconnection status is currently in the System Impact Study phase.

The development project, which has appeared in recent news coverage, consists of 74 MW of solar capacity. The point of interconnection is the Kings Dominion DP 115 kV.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

King William

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Kings Dominion DP 115 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
FOURRIVR13.8 KV GT501
POI Substation
Kings Dominion Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.